Welcome Guest [Log In] [Register]


Add Reply
Gas furnace ignition
Topic Started: Jan 26 2018, 09:20 AM (36 Views)
meishengchao

{Furnace slag fill is an important preparatory work before opening, to fill foundation in building houses like slag, if the foundation did not play well after the housing will tilt, if no slag fill is likely to cause a partial phenomenon appeared in furnace. Fill hanging ash slag should be large, some factory more attention to this aspect, will be screened to remove fine slag slag and slag slag in small particles should be filled, only to Yu 25 mm clinker in the furnace, but mostly to the size of mixed slag fill in the furnace,High quality well type resistance furnace and the slag accounted for most of the slag should not fill in the furnace.
1200C electric lab Atmosphere Muffle vacuum heat treatment furnace
To fill in the clinker there for the following requirements: one is the low water requirements (filling in between the skirt and the base of the furnace slag can be high moisture slag slag is two), low carbon content (e.g. less than 20%), if the carbon content is too high, when after the ignition, this part will continue to affect the combustion grate. The ventilation gap between the grate should be cleaned before the slag filling, and the slag should not be filled to the ventilation gap when the slag is filled. Slag fill to the grate (CAP) on the slag deposition is 200 mm, is conducive to the formation of Steamed Buns and ventilation, but some units fill slag for the opposite, 1# grate is slag is basin shaped and low in the middle, edge high, and this may be related to the structure of the ash system (ash faster this case is often used in the form of slag fill edge).KSS 1400TB Laboratory Horizontal Vacuum Quartz Tube Furnace With Max Temp 1400C
Offline Profile Quote Post Goto Top
 
1 user reading this topic (1 Guest and 0 Anonymous)
« Previous Topic · Forum Number One · Next Topic »
Add Reply




Skin orginally created by Tariq | Converted by Lewis of the ZetaBoard Theme Zone