| Chinese Army Projects | |
|---|---|
| Tweet Topic Started: May 10 2010, 04:10 AM (327 Views) | |
| People's Republic of China | May 10 2010, 04:10 AM Post #1 |
![]()
Market Socialism?
![]() ![]() ![]() ![]() ![]() ![]()
|
Type 100 MBT![]() Speed: Ground: 62.3 mph (100 kph) maximum road speed; 35 mph (56 kph) maximum off-road speed. The vehicle is designed to traverse virtually all terrain and can climb at up to a 60% grade although at a much slower speed (About 10% of maximum road speed). It can also climb barriers and ford trenches. The vehicle can also handle side slopes of up to 30%. Statistical Data: Height: 11.5 feet (3.45 meters) to top of mini turret. Width: 15.33 feet (4.6 meters) Length: 45.57 feet (13.67 meters) with barrel; 33.23 feet (9.97 meters) for just the hull/main body of the tank. Weight: 102 tons (92.5 metric tons) fully loaded Cargo Capacity: Minimal, enough for equipment with crew. Crew: 3 (Commander, Gunner, Driver) Cost: 6M each (wrong cost... originally placed it at 12 with added research cost) Armaments: Gun: 120-millimeter (4.7 in) gun Secondary Weapons: 30 mm Machine Gun Not Expected to ever go into production, more of an experimental project to see if it is economical to build a "Heavy" MBT. Edited by People's Republic of China, May 12 2010, 08:23 PM.
|
![]() |
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
![]() ZetaBoards gives you all the tools to create a successful discussion community. Learn More · Register for Free |
|
| « Previous Topic · Research and Development · Next Topic » |






![]](http://z3.ifrm.com/static/1/pip_r.png)





8:59 AM Jul 11